Managing managers

I've worked on many projects in my career, and just like my style of development has changed, so have my managers. This is not a tutorial on how to manage your manager, as I don't believe you should. No, this is more of an open letter to those managers that seem to enjoy making your life hard when it could be so simple.

I've been advocating Agile methodologies for years, I've seen big design first fail miserably and tdd and xp succeed fantastically. I've also seen the reverse, with very well organized big design first projects, often on complicated enterprise-scale systems, with many developers split into smaller teams that then adopt whichever methodology they are comfortable with.

But the worst cause of failure has always been this strange beast that is the methodology-agnostic manager. By manager I mean anything from Project Manager to Dev lead to self-appointed boss, and by methodology-agnostic I mean someone not following a proven way to ensure you can actually deliver software. This can range from Scrum (that I'm covering here) to various waterfalls to ones grown in house and prooved by time. I'll call him Ralph for the purpose of this rant. And Ralph usually say any of the following.

We'll just drop the unit tests.

This usually comes with We'll document [remember, the unit tests are your main source of documentation!] and the very satisfactory I planned a handover phase on the day you finish your contract. It usually come with a justification: We can fix the bugs after the release date, so we'll be on target.

You just cornered yourself into certain failure, Ralph. This may do for v1, you may survive it for v2 with a lot of time and a lot more money, but by v3 you've failed. Let me repeat that: You will not survive beyond v2 if you do not bet on quality over quantity.

Just do it

That one is a bit borderline. There is always pressure to deliver software, and cutting corners is a fact of life for any software project. After all, shipping is choosing. However (you've seen that one coming didn't you?) this means cutting functionality to ensure quality.

Ralph has a tendency to be terrified at the idea of managing the customer. A new project starts, and sometimes the marketing guy over-promised. Sometimes, the customer has described what they want, and we've provided a rough estimate at the beginning of the project. Sometimes, the business asked, got told yes and now Ralph does not want to go back saying it's not possible to deliver.

The reality is that if you can't deliver, you won't. Trying to hide that fact is ridiculous, you'll end up cutting features or being late anyway. It's better to catch these things early, involve the customer in deciding where to re-prioritise. Otherwise Ralph will make the choices for the business, and probably ask his development team to work over-hours. At that point you've failed.

The other reality is that predicting how long software will take is a dark art that is bound to be inaccurate. I'd probably say that as the complexity of a project increases, the probability of reaching an initial estimate drops to 1 in 5 for any reasonably complex scenarios. You can be a bit off or a lot off, but you won't get what you initially planned.

Ralph loves his excel and this does not fit with his model, and that's understandable. I know the complexity of the tasks I'm doing right now, got a few ideas about the ones in the future, but I have no way to predict how it will all work in 6 months. And I've never seen a single project that, 6 months on (or even 3 months on), still has the same requirements, the same deliverables planned and the same functionality in. Business requirements change and they often get shaped as the software evolves.

What do you do then? The same as you did, you give a rough estimate on how long to deliver the core functionality you describe in use-cases or user stories. Then you shape your project on each sprint to split between the minimum needed to deliver that functionality and the refactoring / framework-ization you deem necessary.

When hard choices are to be made, you'll often find they are about which bugs to fix or which refactoring or new code you want, rather than actual user stories being fulfilled. And that's manageable.

There's a school of thoughts in XP that advocates delivering the minimum amount of functionality and refactoring until you get a good enough solution. However, this is only applicable to applications with good code coverage (> 80%). Parts of your application built without TDD or without tests are probably impossible to put under tests easily, and refactorings become increasingly dangerous and expensive. In those instances you're probably better off rewriting from the ground-up. Remember, your prototype is *not* your v1.

This won't get used for long

Ah this one is by far my favourite of all. The first rule is that the prototype is your v1. It *will* end up being used, and will take ages to be decommissioned, if it ever is. Your v1 will try and make this usable, but you'll be stuck with the original design. The customer will not understand why your v1 cost so much more for a few improvements over the prototype. Ralph will not have the courage to say that the prototype didn't cut the mustard.

The only way to sooth the process is to hammer to Ralph: The prototype is not your v1. I know it's in prod and it works but it is *not* a v1. You can ensure it doesn't get used further by putting time bombs, erasing all the data every day and changing where your app is deployed on every release.

Just quick fix damn it!

This is also a common pitfall. It is perfectly reasonable in some instances to walk around an issue you cannot resolve. You document it and discuss it after investigating the problem and finding the root cause.

This is where Ralph comes in. Usually you describe in your daily that an issue has arisen and you need to investigate. Ralph sees a risk, and immediately will start pressuring for any investigative work to be stopped and a fix to be found. Under some circumstances it's reasonable, under most implementing a work-around for an unknown root cause will just remove the symptom without knowing the illness. You just left for later a big giant loophole in your code-base. It is sometimes the right thing to do but rarely.

Scrum doesn't work

This one is fascinating. Scrum is a fabulous methodology, but just like it is very difficult not to stop doing test-driven development under pressure, it seems terribly difficult for the newly appointed scrum master not to fall back into bad habits: micro-management and authority.

All these things happen because Ralph feels he is the one giving orders and splitting the tasks, and as such needs to keep control. This does not work. Let me repeat that. This does not work. A scrum master is there to relieve any impediments on writing software. The product owner decides what gets priority. The development team is self-organizing, because the development team is the one building the software. The devs build it, the scrum master doesn't. Ralph doesn't. So Ralph shouldn't decide, and that's a good thing.

It is good to loose control over the minor details. I'll offer you two reasons.

First, only the developers understand the complexity of writing code for the project on the platform they target. If Ralph has a development background, it was probably years ago and chances are, because he's a project manager now he's not writing any code. He can't decide on how things get done because he doesn't understand them. Then Ralph spends an awful amount of time and effort trying to understand the details of each bit of functionality to regain control. This is the worse scenario as any development planning, meeting and decision has to involve him. Ralph is now needy and has become an impediment.

Second, Ralph will work more efficiently with his colleagues if he's not constantly fighting for power. The product owner decides where the priorities are and which direction the dev team will adopt. Remember, the product owner is the voice of the customer. It's whoever decides what gets in the software. Ralph doesn't use the software, he's not the user. He doesn't talk to the users, that's the product owner. As such he has no idea what bits of functionality the customer wants to implement first. And he has nearly no control over developers because he's not the one building the software and is not involved in writing the code. If Ralph continues to try bossing people around about the code, it will end up impeding the dev team's capability to deliver.

Of course sometimes you end up with the absolute worst case scenario where the scrum master and the product owner titles are both given to Ralph. That's a recipe for disaster.

The daily stand up

This is way too common. Ralph has other issues to discuss, ranging from adding coloured cells to his excel spreadsheet to being explained a component's functionality. So you end up with No we'll do this meeting first and then we'll do the stand-up. You can see the face of developers when they realize they're going to sit around a table and watch a discussion that has very low impact on them they didn't intend on participating in: after all they came for a daily stand-up. Or you end up with we don't need to stand-up for stand-up meetings, a corollary where the purpose of the stand-up is not understood so the format is not respected.

So here's my rule of thumbs to know when you're screwing up: If you hear a developer moaning before the meeting because he knows it's going to end up taking ages; if you sit down; if the discussion is between two people and the others watch: you just ruined your stand-up meeting and the rhythm that's supposed to be associated with it. You got everybody bored and lost an hour of their time.

One last thing to any scrum master out there. You're supposed to track down how many tasks get completed, how many new ones get added, and with those numbers do your estimations on the likelihood of completing your sprint. If you don't do that, the nice cards on the board probably don't help anyone. Analyzing those tasks is what will let Ralph do his spreadsheet, if he's not following them he's not doing his job properly.

The planning meeting

Well this one is easy, it takes time, we write down all the new tasks, we update the product backlog, decide what we want to achieve for the next iteration based on the prioritisation of tasks agreed with the product owner.

However, old habits die hard, and it is overwhelmingly difficult for Ralph to accept that the planning is there to plan the current sprint, not to answer the question of how many months the whole thing is going to take. It gives a good idea of where you are and how likely you'll match your target, but it is in no way there to let Ralph write his excel spreadsheet for hours and hours. It's Ralph's job to understand what is going on and report to the business, it is not the developers'. Ralph, you're the one in charge of excel, embrace the process and keep the planning you sell to the business to yourself.

The post-mortem

I like calling it the post-mortem but there are many other names for it, from wrap-up to release party to the more common sprint retrospective. This is the moment where you analyze why you've not matched your targets, what you've done well and how you can improve the process.

This goes bad when the blame game starts being played. The only way to get something efficient out of a post-mortem is for everybody to understand and agree that estimates are exactly that, estimates. This also means that you accept that you're late and can explain what were the reasons, ranging from your lack of skills to dependencies on other components. No one should get penalized for encountering problems.

The half scrum

Another common misconception is that you can adopt a few bits of Scrum and be successful. I've never seen a project with a bit of scrum in there succeed. Neither have I seen a big plan project succeed without a very strong structure to compensate for the unreliable nature of software development. All in all, because Ralph can't decide which bits of a methodology he's going to use, he uses a bit of everything. This is a recipe for disaster and confusion.

The split responsabilites

This one is tricky. One of the most important bits is the work split. Having each developer work on a different component is a normal occurrence. However, you'll often find that on small teams, it is more efficient to work altogether on one thing rather than split each developer on each project. Assigning ownership to part of the projects to one-man team destroys communication between developers, reduces the rate at which they can code, and ends up more often than not with an inability to deliver anything in a sprint: You do half of two tasks instead of finishing one task well.

Ralph often likes to separate his eggs and have each developer in charge of one bit, so he can go and manage each of them individually. It becomes much easier for his excel spreadsheet. This silo development undermines the concept of working as a team, and often comes from Ralph trying to regain control on a project he has no visibility on. As we've seen before, visibility is there, but Ralph refuses to change his ways and embrace the reason behind agile. This is once again a recipe for disaster.

Conclusion

Here's a recap of all the bad habits Ralph has:

  • He gives up code quality to try and achieve deliveries
  • He's taking away from the business the choice of what gets delivered and the prioritisation of those elements
  • He lives in fear of telling the business how things are really going
  • He believes it will be easier to deliver now and refactor later (the prototype is your v1)
  • He does not care about finding the cause of an issue and focuses only on the work-around
  • He can and need to understand and decide how the software is written and who writes what
  • He has to give orders (it's often the case that Ralph is the project manager but not your line manager...)
  • He doesn't respect the daily meeting
  • He wants to fill his 12 month plan and doesn't track the sprint backlog (the tasks on the whiteboard)
  • He wants the help of developers to do his 12-month plan, because the tasks are not enough (after all he doesn't track them)
  • He believes the plan is the solution to everything
  • He believes he's good enough to reinvent a methodology by mixing bits and pieces
  • He believes in splitting people to split tasks and regain control (silo development)

This Ralph is a disastrous scenario and very rarely will you encounter people showing all those signs. But if you try to deliver software in this day and age, and you can see in your project management more than a few of those points, I would advise extreme caution, as I believe you'll end up failing on your deliveries and ending up with a unmotivated team.

On a bright note, Ian Cooper told me once something that I kept at heart: everybody tries to do the right thing. Not knowing and fearing are normal things, failing is part of learning, and people willing to evolve overcome those limitations. Great managers are the ones that take the knowledge from their coworkers, embrace that change and adapt to and work with and for the people they manage.

Monday, 15 October 2007

Microsoft and the Magic sweet spot

As I was coding away on the train today, for a few minutes my mind blanked while watching the landscapes Virgin offer to us regular travelers. The did an amazing job at decorating the length of the track, to the point where you'd nearly get fooled into thinking there are actually villages, cows and other things between London and Manchester. As it happens sometimes, I started thinking about my early days as a fresh and learning developer, many many years ago.

Against the normal academic training some IT people receive, I evolved as a developer from the top down. I didn't do University and got no degree in IT. I actually got as far as studying law. I learnt everything by starting to write HTML web sites back in 95, then started JavaScript in 96 and VB in 97, and discovered JScript.net and C# when I got through a friend an early preview of what was to become .net (NGWS anyone?). And I'll admit that while I understand how x86 works and how pointers work, I am absolutely unable to write a single like of C++ or any other esoteric close to the metal languages (I hope esoteric here is not taken as a challenge of C++ usefulness, as I'm sure the gurus amongst you will have understood). And it's only after all these years of coding that I start understanding calling conventions, Win32, etc.

It all got me thinking about how you understand a language and a platform. Until you reach the thorough knowledge that only years of experience will bring you, you often ignore the why question, preferring the answer to the how: you care about how you achieve a result, with the acceptance that you do not understand why it needs to be done in a specific way.

For example, in JavaScript, you'd add a method to an object type by adding it to its prototype property. You know that instance methods and type methods are two different beasts intuitively, because var $cube = new Cube(); $cube.getValue = function () { return 2; } will not work for another Cube you'd create later on. This empirical knowledge is surface magic for however long you'll take to dig deeper, learn and discover what a prototype is and how it relates to objects. At this stage, if things go wrong you'll probably have to learn more things. And it's an open ended confusing thing because both $cube.getValue and $cube.prototype.getValue can exist.

Another example comes from the WPF world.. Whenever you create a custom library of Controls for WPF, you learn about themes and how styles and templates get applied to your controls. You know that the themes being selected for a control are the end of the line customizations you provide, and you know you have to declare an attribute at the assembly level, and we're still very much in the domain of empirical knowledge. But you also know that the fallback when you don't provide themes is a file in the themes folder called general.xaml. You know the how but the why has no answer. It is a decision the framework designers took, and you have no way of changing it or influencing it in any way. This by design rule is crystal magic. The behavior cannot be changed, and once you learn how to do it, the why question is irrelevant. And if it doesn't work, there's no additional knowledge cost, because you don't need to learn anything else.

My point in all that is that these two magical elements have conflicting developer audiences. More Junior developers (and some senior developers I've worked with in the past), let's call them Mortimer, are happy with crystal magic, because it massively reduces the surface of the API you need to learn. More senior developers that have a will to understand (anyone that uses reflector as his main documentation tool would fall in this category), let's call them Einstein, tolerate surface magic because they can crack the surface, dig deeper and know all the intimate details of how the surface is achieved. They don't necessarily like crystal magic because it just works and they have no control over it, but as it's a closed ending, there's nothing that can be done about it, so they move on.

Everything would be for the best if surface magic worked for Mortimer. APIs like WCF provide a very simple surface magic, with only ServiceContract, OperationContract and DataContract concepts to learn. With the tooling support for WCF services in visual studio, the surface is small enough for most developers to start being productive very quickly. The reality strikes as soon as something unexpected happens: passing too big of an object graph, or worse, a cyclic reference within the DataContracts. Suddenly, Mortimer faces understanding notions such as bindings, behaviors, configuration files, and many other concepts that multiplies exponentially the API surface they need to understand before they can fix a problem. You just designed an API that targets Mortimer when everything works, but that requires Einstein to fix if anything goes wrong.  That said, tooling support is appropriate for being productive, which should ensure WCF adoption, so we're pretty close to the sweet point.

WPF on the other hand has a bit of both. Xaml is easy enough for Mortimer: it's understandable and can be fixed by Mortimer, because most of the bindings between DependencyObject and Xaml follows a crystal magic design. The property store will map Xaml and DependencyProperties based on the name, and nothing you want or can do will change this. You also very much pay as you go when you learn Xaml, because you can start with simple object graphs, and discover attached properties at a later time. You can use them without understanding them, and often you'll be able to fix issues by learning a bit about the Binding syntax. On the other hand, it's a very large platform and requires much more time than Mortimer would spend learning a new technology. Areas like Bindings are complex when they don't work, outputting errors to the debug window is confusing when you don't know where to look, the coexistence of logical and visual trees is difficult to grasp for winforms developers, etc.  Tooling support should help, but from what I see in beta 2, I don't believe the sweet spot will be hit with this version of Visual Studio.

And finally PowerShell is a deliciously efficient crystal magic solution. Things work as expected, pipes and formats work by magic, using a defined behavior that will not change. The framework is static enough that people are confident that the knowledge they learn using the script engine will be valid whichever Commandlet they call. The built-in variables work automatically. $_ will always have the same meaning, $$ too.

What Microsoft doesn't have anymore is a completely crystal magic solution for development. ASP was very much crystal magic, ColdFusion was too, back in the CFML days. Early days VB had few extensibility points which let developers grasp the platform more easily. PHP still has a bit of that feel, just like many other frameworks that limit choice and extensibility to increase the pace at which their developers become experts. When most of your developers know 80%+ of your API, you know you're on the right track. Anything under that and you face a problem: You're segmenting your market between Mortimer and Einstein. Your Mortimer has to get more knowledgeable to survive your technology update, your Einstein will just keep doing his expert job. The low end of the Mortimer market is gone to join the ranks of other easier and simpler technologies.

The sweet spot is not to try and provide one API for everyone, but to provide one crystal magic API for the quick and easy, and a completely different solution for Einstein and upgraded Mortimer.

Getting dynamically typed languages with the DLR is going the right direction. But now, this is a call for action to you Microsoft: Provide us with simple tools with a lot of magic to gain back the people gone to LAMP. Give us a forms design tool that maps any control on a form if the form is named after a table and a control is named after a field in that table. Give us a web tool that simply easy work with no mvc, no presenter, and a simple script language to inject a bit of server side code where it makes sense.

And remember that a crystal magic API is one that you *do not extend*. Not everyone needs a framework.

P.S.: This is just my opinion on why we're loosing so many people to php and other simpler technologies. I have a lot of designer friends that just plain refuse to touch any Microsoft technologies, because PHP is so simple. I'm probably not the target audience for any of this. Any resemblance with current or previous coworkers is purely intentional. No guarantees implied or granted. Do not use in a nuclear facility. Etc.

Technorati Tags: , ,

Sunday, 30 September 2007

Software that sucks #1: Why you should do your testing on the train

This is a new rant series where I moan and exhibit my frustration with using some software that has been designed or tested by monkeys. I'll try as much as I can to be constructive and propose reasonable solutions, but sometimes there's just nothing to do to save software with poor design or engineering.

One more week-end, once more another 03:50 hours train trip. I do like these travel times as I feel I knock down work for this blog the most efficiently when I'm on the train.

One thing I don't have is proper connectivity. I have a Vodafone Mobile Connect ExpressCard for my beloved MacBook Pro, which does ensure a nice and easy 3g+ connection to the Internet wherever I am (how I wish apple would include a UMTS/HSDPA chip in their laptop so I could do without the express card). But you see, while France has a vast network of high speed trains on which they ensure mobile phones work (and Paris even has phone connectivity in the tube!), Shakespeare's land is not as gifted. Reception on the London - Manchester line is dreadful, with a few areas with 3G or 3G+ (if the train is stopped), some areas with GPRS, and a few areas where the signal drops too much for anything to go through. As a result, my card disconnects and reconnects every couple of seconds. And that's where I'll do my strangest assertion to date: If you develop any kind of connected application that may be used on a laptop, plan for your testing to happen on the train.

The regular loss of connection for a short while should be and is supported by the TCP stack to a certain extent. But your application *should not* rely on the connection being there. Separating the use of the data from the reception / emission of the data should be priority number one of application developers, and timeout / crash / retry management should be baked in. Outlook does this with it's offline Exchange mode, that separates the caching and receiving of emails between local and remote store, and the displaying of the local store.

However, Internet Explorer doesn't seem to work the same way. It has trouble with displaying web sites if the TCP connection gets suddenly suspended for a while: after doing a small network trace with ethereal, the data gets received again, but for some reason wininet decides to hang in there for a while and do nothing, even if you start a new tab. Closing and reopening the browser solves the issue.

Where it makes me scream is when it's not software, but drivers that encounter these issues. Like the ExpressCard driver. Has any of the engineers working on this driver ever tried it in low reception areas? Expect crashes, hangs, your mouse blocking for a few seconds. Absolutely dreadful. And all this on Windows Vista of course.

Technorati Tags: , , , ,